We carried out the demolition of several structures on a site in the Braník cadastral area. This included the demolition of a single-story and a multi-story office building, two dormitories, garages, and sheds.
As part of the preparatory work prior to demolition, municipal waste was removed from the designated buildings, and building structures containing hazardous materials—specifically asbestos—were professionally dismantled. These structures were properly dismantled and disposed of in accordance with applicable legislation and the permit issued by the relevant Regional Public Health Authority.
The scope of work also included the removal and disposal of all demolition waste. The affected area was finally cleaned up and handed over to the investor.