TREPART s.r.o. carried out the demolition of a former barn in Prague’s Čakovice district.
The work involved the gradual dismantling of the structure using heavy demolition equipment (excavators fitted with demolition shears, etc.). All resulting construction debris was sorted and transported to a designated disposal site.
The work included the disposal of hazardous materials containing asbestos. These materials were professionally removed and disposed of in accordance with applicable legislation, while complying with all safety standards.
During the construction work, which took place within the village limits, emphasis was placed on minimizing the negative impacts of the demolition, i.e., preventing the surrounding area from being affected by excessive noise, vibrations, and tremors exceeding the established limits.
All activities proceeded according to the schedule approved by the client.