At the Synthesia Pardubice site, we carried out the demolition and removal of contaminated structures that had been used for chemical production.
The primary objective of demolishing these contaminated buildings was to reduce the risk of soil and groundwater contamination.
The contaminated debris and construction materials were disposed of in an environmentally responsible manner at a designated landfill site.