We carried out mechanical and partially manual demolition of 13 unused railway structures and facilities along the tracks due to their poor condition and the risk of injury.
The demolition also included the removal of structures containing hazardous material—asbestos. This material was handled in accordance with applicable regulations and health standards.
All construction debris generated by the demolition was sorted in accordance with applicable legislation and transported to designated disposal sites.
The demolition work was carried out with due regard to the location of the structures within the railway right-of-way, i.e., in the immediate vicinity of the railway tracks.